Ignition Cable: Testing and Inspection
INSPECTION OF HIGH-TENSION CORDS1. REMOVE INTERCOOLER
2. CAREFULLY REMOVE HIGH-TENSION CORDS BY THEIR RUBBER BOOTS FROM SPARK PLUGS
CAUTION: Pulling on or bending the cords may damage the conductor inside.
3. INSPECT HIGH-TENSION CORD RESISTANCE
Using an ohmmeter, measure the resistance without disconnecting the distributor cap.
Maximum resistance: 25 k ohms per cord
If the resistance is greater than maximum, check the terminals. If necessary, replace the high-tension cord and/or distributor cap.
4. INSTALL INTERCOOLER