Air Conditioning Switch: Testing and Inspection
Connector View:
1. Disconnect negative cable from battery.
2. Pull out A/C switch from center cluster.
3. Disconnect A/C switch connector.
4. Check A/C switch for continuity between terminals.
5. If continuity is not as specified, replace the switch.
6. Connect A/C switch connector.
7. Install A/C switch.
8. Connect negative cable to battery.