Air Conditioning Switch: Testing and Inspection
Fig. 5 A/C Switch Continuity Test:
1. Unplug switch electrical connector.
2. Check continuity between specified switch positions, Fig. 5 and switch terminals.
3. If no continuity is indicated, replace switch.