Installation
Oil Charge PipeINSTALLATION
1) Install the oil charge pipe.
NOTE:
Use new bolts and O-rings.
Tightening torque:
38 Nm (3.9 kgf-m, 28.0 ft-lb)
2) Install the turbine speed sensor 1 and harness, and then connect the connector.
Tightening torque:
7 Nm (0.7 kgf-m, 5.2 ft-lb)
3) Install the front exhaust pipe.
4) Install the under cover.
5) Lower the vehicle.
6) Connect the battery ground terminal.