Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation

Installation

1. Installation of transmission control computer ASSY
(1) Install the transmission control computer ASSY to the transmission control computer bracket with 2 nuts.
Standard value:T=7.5Nm {77kgf-cm} {5.5ft-lbf}
(2) Install the transmission control computer ASSY with 2 nuts.
Standard value:T=7.5Nm {77kgf-cm} {5.5ft-lbf}
(3) Connect the 2 connectors to the transmission control computer ASSY.
2. Installation of instrument panel under cover SUB-ASSY No.1
3. Installation of instrument side panel RH
4. Connection of battery ground terminal
5. Initialization when removing/installing battery terminals