Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

5MT

INSTALLATION

PITCHING STOPPER

1) Install the pitching stopper.

Tightening torque:
T1: 50 Nm (5.1 kgf-m, 36.9 ft-lb)
T2: 58 Nm (5.9 kgf-m, 42.8 ft-lb)





2) Install the intercooler.
3) Connect the battery ground terminal.

CROSSMEMBER AND CUSHION RUBBER

1) Install the transmission cushion rubber to the transmission, and tighten the bolt (A).
2) Install the transmission cushion rubber to the center crossmember, and tighten the nut (B).

Tightening torque:
Bolt (A)
35 Nm (3.6 kgf-m, 25.8 ft-lb)
Nut (B)
35 Nm (3.6 kgf-m, 25.8 ft-lb)





3) Install the front crossmember and rear crossmember.

Tightening torque:
T1: 70 Nm (7.1 kgf-m, 51.6 ft-lb)
T2: 140 Nm (14.3 kgf-m, 103.3 ft-lb)





4) Remove the transmission jack.
5) Install the heat shield cover.
6) Install the center exhaust pipe.
7) Install the rear exhaust pipe and muffler.
8) Lower the vehicle.
9) Connect the battery ground terminal.