Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation

INSTALLATION

1) Install the oil charge pipe with O-ring.

NOTE:
- Use new gaskets and O-rings.
- Apply ATF to the O-ring.

Tightening torque:
38 Nm (3.9 kgf-m, 28.0 ft-lb)






2) Install the starter.
3) Install the air intake boot assembly. (non-turbo model)
4) Install the intercooler. (turbo model)