Oil Charge Pipe
Oil Charge PipeREMOVAL
1) Remove the air intake chamber.
2) Remove the oil charge pipe, and then remove the O-ring from the flange side.
INSTALLATION
1) Apply ATF on a new O-ring and install together with the oil charge pipe.
NOTE: Use a new bolt.
2) Install the air intake chamber.
INSPECTION
Make sure the oil charge pipe is not deformed or damaged.