Installation of Power Controller and Harness "B"
1. Before beginning, ensure the battery is still disconnected. Harness "B" is installed under the hood between the negative terminal on the motor pump and 11 pin brown check connector F62 located near the left strut tower. See Figure 3.
2. Remove the existing power controller. Note proper wire placement and orientation. To install new power controller, first insert the eye hook terminal of harness "B" through the rubber protector/insulator on the blue line from the new power controller and secure both to the negative terminal of the motor pump. See Figure 4.
3. Fasten remaining wire terminals to complete installation of the new power controller. Ensure all previously removed terminals are refastened tightly and correctly.
4. Run harness "B" behind wiper motor and existing harness towards the left hand strut tower. Mate harness "B" with F62 of the vehicle's wiring harness. When harness "B" is properly positioned, secure with vinyl tape every 2-4 inches as necessary.
5. Reconnect battery cable.
6. Using the diagnosis connector (Figure 2), perform a D-check as outlined on the diagnosis access information page.
7. After completing D-check, reinstall trim panel.
8. Test drive vehicle.
A diagnostic supplement will be released shortly providing full details on interpreting trouble codes and confirming component operation. Until then, additional information on diagnosis is available through the SOA Tech Helpline.