Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation






TX6A AUTOMATIC TRANSMISSION / TRANSAXLE: SHIFT LEVER: INSTALLATION; 2013 MY FR-S [03/2012 -]

1. INSTALL SHIFT LEVER ASSEMBLY

(a) Install and tighten the 4 bolts in the sequence shown in the illustration.





Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)

(b) Engage the wire harness clamp.

(c) Connect the 2 connectors.

2. INSTALL CONSOLE BOX ASSEMBLY

Installation

3. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY

(a) While pushing the shift lock release button, move the shift lever to N.

(b) Using tape, hold a 0.3 mm feeler gauge on the floor shift control select lever.





(c) Using tape, attach the floor shift control select lever to the console box assembly.





NOTICE:
Make sure that the feeler gauge is not on the area shown in the illustration.

(d) Turn the transmission control shaft lever RH of the park/neutral position switch assembly counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.





(e) Temporarily install the floor shift gear shifting rod sub-assembly with the nut.

(f) Tighten the nut while lightly pushing the lever rearward.

Torque : 18 Nm (184 kgf-cm, 13 ft-lbf)

NOTICE:
Do not push the lever too hard.

4. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview

5. INSTALL NO. 2 ENGINE UNDER COVER Installation

6. INSTALL NO. 1 ENGINE UNDER COVER Installation