| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Transaxle, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
| Replace |
| Complete Assembly Without Transfer Of Parts | 3.0 | 2.2 | B | |
| NOTE |
| To R&R Driveplate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter Add | 0.2 | 0.2 | B | |
| Complete Assembly With Transfer Of Parts | 3.6 | 2.4 | B | Includes: R&I Transaxle. |
| NOTE |
| To R&R Driveplate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter Add | 0.2 | 0.2 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| To Replace Crankshaft Rear Main Oil Seal, Add | 0.5 | 0.3 | B | |