| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Complete Assembly Without Transfer Of Parts | 11.6 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Complete Assembly With Transfer Of Parts | 14.6 | 0.0 | B | Includes: Transfer Of All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| Long Block | 18.6 | 0.0 | A | Includes: R&I Engine And Transfer All Necessary Components Not supplied With Long Block. |
| Short Block | 21.6 | 11.3 | A | Includes: R&R Engine And Transfer All Necessary Components. |
| NOTE |
| To Replace Cylinder Head, Add |
| One Bank | 2.3 | 1.9 | A | |
| Both Banks | 3.8 | 0.0 | A | |
| To Grind Valves, Add |
| All Cyls | 3.4 | 2.8 | A | |
| Overhaul/Rebuild | 31.1 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Fit Pistons, Rings, Pins, Main & Rod Bearings, Grind Valves & Tune-Up. |