Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| Right Bank | 18.8 | 13.0 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| Left Bank | 20.0 | 14.3 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| Both Banks | 26.3 | 18.8 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| NOTE | ||||
| To Knurl Valve Guide, Add | ||||
| Each | 0.1 | 0.0 | A | |
| To R&R Valve Guide, Add | ||||
| Each | 0.2 | 0.0 | A | |
| To Ream Valve Guide, Add | 0.1 | 0.0 | A | |
| To R&R Timing Chain, Add | 1.0 | 0.0 | A |