Preparation For Test
Preliminary Work:
- Perform Diagnosis, check Diagnostic Trouble Code (DTC) Memory
Preparation for Test:
1. Fuses OK.
2. Battery voltage > 11 V.
3. Install model specific HHT module into HHT.
4. Connect Hand-Held Tester (HHT) ).
5. Connect socket box with test harness according to connection diagram.
6. Model 129: Connect impulse counter according to connection diagram.
7. Electrical wiring diagrams.
Special Tools
Conventional Tools, Test Equipment:
Description Brand, model, etc:
Multimeter 1) Fluke models 23, 83, 85, 87, 88
1) Available through the MBNA Standard Equipment Program.
IR DAS Control Module Connection Diagram - Socket Box:
001 IR DAS control module connector
002 Test cable (202 589 15 63 00)
003 Multimeter
004/050 Socket box (35.pole)
N54/1 IR DAS control module
NOTES:
- IR DAS control module (N54/1) located behind instrument cluster (model 210 shown).
- Using the Hand-Held tester (HHT), erase DTC'S for SRS Airbag after installation of instrument cluster and steering wheel.
RCL Control Module Connection Diagram - Socket Box:
(model 202 shown)
001 IR DAS control module connector
002 Test cable (126 589 20 63 00)
003 Multimetor
004/050 Socket box (35-pole)
N54 RCL control module
NOTE: RCL control module (N54) for models 129,140, 210 see Component Locations