Preparation For Test - Section 35
Figure 1:
Preparation for Test
1. Connect socket box tester to engine control module (N3/10).
2. Disconnect 2- pole connectors on injectors.
3. Remove fuel rail with injectors, thereby not disconnecting the fuel feed and return lines.
4. Connect self- made harness (048) to each injector one after another.
5. Hold each injector in measuring glass one after another.
NOTE: Connect interior harness connector to connection 1 on test cable Connect engine harness connector to connection 2 on test cable
Special Tools:
Conventional tools, test equipment
Description Brand, model, etc.
Measuring glass (1 liter minimum) local purchase
1) Available through the MBNA Standard Equipment Program.
Self Made Harness:
Consists of:
1 Connector (140 545 35 28)
2 Contact spring (004 545 56 26)
1 Banana plug (red)
1 Banana plug (black)
2.2m Wire (red, 1.5 mm)
2.2m Wire (brown, 1.5 mm)
2.2m Harness tubing (6 mm diameter)