| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Tune-Up | 1.5 | 0.0 | B | Includes: R&R Trans Pan, Service Filter & Make All Necessary Adjustments. |
| Diagnose/Test |
| Transmission, Diagnosis | 1.8 | 0.0 | A | Includes: Time To Hook-Up And Disconnect Test Equipment. Checking System For Fault Codes, Road Test And Hydraulic Pressure Test As Required. |
| Replace |
| 4 Speed |
| Complete Assembly Without Transfer Of Parts | 10.2 | 6.2 | B | |
| NOTE |
| To R&R Drive Plate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 10.8 | 7.7 | B | Includes: R&I Transmission. |
| NOTE |
| To R&R Drive Plate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| 5 Speed |
| Complete Assembly Without Transfer Of Parts | 10.2 | 7.0 | B | |
| NOTE |
| To R&R Drive Plate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 10.8 | 7.5 | B | Includes: R&R Transmission. |
| NOTE |
| To R&R Drive Plate, Add | 0.2 | 0.2 | B | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | B | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | B | |
| Overhaul/Rebuild |
| 4 Speed | 24.9 | 16.6 | A | Includes: R&I Transmission. |
| NOTE |
| To Overhaul Valve Body, Add | 1.5 | 0.0 | A | |
| To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |
| 5 Speed | 24.9 | 16.6 | A | Includes: R&I Transmission. |
| NOTE |
| To R&R Torque Converter, Add | 0.2 | 0.0 | A | |
| To Flush Cooler Lines, Add | 0.6 | 0.0 | A | |