Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Solenoid Valve Removal/Installation (Secondary Control Valve Body)

SOLENOID VALVE REMOVAL/INSTALLATION (SECONDARY CONTROL VALVE BODY) [FS5A-EL]
1. Disconnect the negative battery cable.
2. Remove the battery and battery tray.
3. Remove the under cover.
4. Drain the ATF
5. Remove the oil cover.
6. Remove the secondary control valve body.





7. Remove the bracket.





8. Remove the solenoid valve(s).
9. Apply ATF to a new O-ring and install it on the solenoid valve.
10. Install the solenoid valve in the secondary control valve body.

Tightening torque 7.8 - 10.8 N-m (80 - 110 kgf-cm, 70 - 95.4 in-lbf)

11. Install the secondary control valve body.
12. Install the oil cover.
13. Install the under cover.
14. Connect the negative battery cable.
15. Add ATF.
16. Perform the mechanical system test. (See MECHANICAL SYSTEM TEST [FS5A-EL].) Mechanical System Test
17. Perform the road test. (See ROAD TEST [FS5A-EL].) Road Test