Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Idle Speed

PREPARATION
- Warm up the engine to normal operating temperature.
- Shift the transaxle into Neutral (MTX) or P position (ATX).
- Turn off all loads.
- Headlight
- Blower motor
- Rear window defroster
- Power steering
- Wait until the cooling fan stops.




- Connect the SSTs (NGS) to the data link connector-2 and select the PID/DATA MONITOR AND RECORD function.
- Select the "RPM" on the NGS display.

IDLE SPEED
- Perform "Preparation".
- Connect the SST (System Selector) to the data link connector.
- Set switch A to position 1.
- Set the test switch to SELF TEST.

CAUTION: The throttle adjusting screw is set at the factory and must not be adjusted. Any adjustment will negatively effect the engine performance.




- Adjust the idle speed by turning the air adjusting screw.

Specification:
650 - 750 (700 ± 50) rpm [MTX]
700 - 800 (750 ± 50) rpm [ATX]


- Disconnect the SST (System Selector).

BAC Valve mounting bolts torque 2.9-4.0 Nm (26-35 in. lbs.)