Installation
CELLULAR COMMUNICATION: MAYDAY ECU: INSTALLATION
INSTALLATION
HINT: A bolt without a torque specification is shown in the standard bolt chart Standard Bolt - Specified Torque For Standard Bolts.
1. INSTALL MOBILE PHONE BRACKET
(a) Install the 2 mobile phone brackets with the 4 bolts.
2. INSTALL MAYDAY ECU
(a) Install the ECU with the nut.
(b) Connect the 4 connectors.
(c) Attach the 2 clamps.
3. INSTALL LUGGAGE COMPARTMENT TRIM COVER ASSEMBLY LH Installation
4. INSTALL LUGGAGE COMPARTMENT TRIM COVER ASSEMBLY RH Installation
5. INSTALL REAR FLOOR FINISH PLATE Installation
6. INSTALL TOOL BOX (w/o Spare Tire) Installation
7. INSTALL DECK BOARD ASSEMBLY (w/o Spare Tire)
8. INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER Installation
9. INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY Installation
10. INSTALL DECK TRIM SIDE BOARD RH Installation
11. INSTALL ROPE HOOK Installation
12. INSTALL ROPE HOOK ASSEMBLY Installation
13. INSTALL BATTERY SERVICE HOLE COVER Installation
14. INSTALL NO. 1 COOLER COVER Installation
15. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
NOTICE:
When disconnecting the cable some systems need to be initialized after the cable is reconnected Repair Instruction - Initialization.
16. INSTALL BATTERY SERVICE HOLE COVER LH Installation
17. INSTALL DECK TRIM SIDE BOARD LH (w/o Spare Tire) Installation
18. INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY Installation
19. CHECK SRS WARNING LIGHT
(a) Check the SRS warning light Diagnosis System.
20. PERFORM REGISTRATION
(a) Perform registration Programming and Relearning.
NOTICE:
When replacing the mayday battery or the mayday ECU (together with mayday battery), perform registration.