| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Oil Leak, Diagnosis | 1.0 | 0.0 | B | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 21.1 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Complete Assembly With Transfer Of Parts | 23.6 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include: Transfer Of Optional Equipment. |
| Short Block | 31.1 | 19.5 | A | Includes: R&I Engine And Transfer All Necessary Components. |
| NOTE |
| To R&R Cylinder Head, Add |
| One Bank | 3.8 | 3.1 | A | |
| To R&R Camshaft, Add |
| One Bank | 0.4 | 0.3 | A | |
| To Grind Valves, Add |
| All Cylinders | 12.6 | 10.4 | A | |
| To Overhaul Oil Pump, Add | 0.4 | 0.3 | A | |
| Long Block | 28.1 | 0.0 | B | Includes: R&I Engine & Transfer All Necessary Components Not Supplied With long Block. |
| Overhaul/Rebuild | 41.1 | 38.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders, Fit Pistons, Rings, Pins, Main & Rod Bearings, R&I Engine, Grind Valves & Tune-Up. |