Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation








2GR-FSE ENGINE CONTROL SYSTEM: INTEGRATION RELAY:

INSTALLATION

1. INSTALL INTEGRATION RELAY
(a) Connect the 3 connectors.






(b) Attach the integration relay to the engine room No. 2 relay block.
(c) Install the No. 2 relay block cover.
2. REMOVE ENGINE ROOM SIDE COVER LH Installation

3. REMOVE COOL AIR INTAKE DUCT SEAL Installation