Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| Right Bank | 11.8 | 8.4 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| Left Bank | 11.8 | 8.7 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| Both Banks | 18.8 | 13.0 | A | Includes: R&I Cylinder Head And Make All Necessary Adjustments. |
| NOTE | ||||
| To Knurl Valve Guides, Add | ||||
| One | 0.1 | 0.0 | A | |
| To R&R Valve Guides, Add | ||||
| One | 0.2 | 0.0 | A | |
| To R&R Valve Lifters, Add | ||||
| One | 0.3 | 0.0 | A |