Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Door Unlock Relay





Inspection

Door Unlock Relay








Check for continuity between the terminals.
1. There should be continuity between the No.1 terminals in the I/P-F and No.5 terminals in the I/P-H when power and ground are connected to the No.1 terminals in the I/P-F and No.9 terminals in the I/P-H.
2. There should be no continuity between the No.1 terminals in the I/P-F and No.5 terminals in the I/P-H when power is disconnected.