Removal and Installation
How to Remove the ECM/PCM Connectors for TestingIf DTC troubleshooting requires voltage or resistance checks at the ECM/PCM connectors, remove the ECM/PCM connectors and test it:
1. Jump the SCS line with the HDS.
2. Remove the center lower cover (A).
3. Remove the duct (B).
4. Disconnect ECM/PCM connectors (C).
5. Open the SCS line with the HDS.