| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | 
| Diagnose/Test | 
| Oil Leak, Diagnosis | 1.0 | 0.0 | B |  | 
| Replace | 
| Complete Assembly Without Transfer Of Parts | 10.2 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.  | 
| Complete Assembly With Transfer Of Parts | 12.7 | 9.0 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment.  | 
| Short Block | 20.2 | 15.3 | A | Includes: R&I Engine, Transfer All Necessary Components, Grind Valves & Tune-Up.  | 
| NOTE | 
| With AC, Add | 0.4 | 0.3 | A |  | 
| To Grind Valves, Add | 7.3 | 5.2 | A |  | 
| To R&R Cylinder Head, Add | 
| Bare Assembly | 
| One Side | 2.2 | 1.6 | A |  | 
| Both Sides | 3.4 | 2.8 | A |  | 
| Complete Assembly | 
| One Side | 0.8 | 0.5 | A |  | 
| Long Block | 17.2 | 0.0 | B | Includes: R&I Engine, Transfer All Necessary Components.  | 
| Overhaul/Rebuild | 30.2 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Fit Pistons, Rings, Pins, Main & Rod Bearings. R&I Engine, Grind Valves & Tune-Up  |