| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Oil Leak, Diagnosis | 1.0 | 0.0 | B | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 7.8 | 0.0 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| NOTE |
| With AC, Add | 0.4 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 10.8 | 8.0 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| NOTE |
| With AC, Add | 0.4 | 0.3 | B | |
| Short Block | 16.3 | 14.3 | A | Includes: R&I Engine, Transfer All Necessary Components, Grind Valves & Tune-Up. |
| NOTE |
| With AC, Add | 0.4 | 0.3 | A | |
| To Grind Valves, Add | 4.5 | 3.2 | A | |
| To R&R Cylinder Head, Add |
| Bare Assembly | 2.2 | 1.6 | A | |
| Complete Assembly | 0.8 | 0.5 | A | |
| Long Block | 14.3 | 0.0 | B | Includes: R&I Engine, Transfer All Necessary Components. |
| NOTE |
| With AC, Add | 0.4 | 0.0 | B | |
| Overhaul/Rebuild | 25.9 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Fit Pistons, Rings, Pins, Main & Rod Bearings. R&I Engine, Grind Valves & Tune-Up |
| NOTE |
| With AC, Add | 0.4 | 0.0 | A | |