Mixture Control Solenoid - Slow Cut: Testing and Inspection
R��(Fig. 81 Primary Slow Mixture Cut-Off Solenoid Valve Testing Procedure:
WARNING
Wipe up any spilled gasoline before testing.
If cut-off valve is removed before testing, be sure you ground it before testing, to prevent sparking or fire when the key is turned on.