Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

R. Valve Body Assembly

INSTALL OR CONNECT





1. Ten check balls into upper valve body.





2. Spacer plate and two new gaskets onto lower valve body; secure with two screws.





3. New lower valve body cover gasket and lower valve body cover onto lower valve body; secure with two bolts.
- Tighten two lower-to-upper valve body bolts to 6 Nm (53 ft. lbs.).








4. Lower valve body with spacer plate and gasket onto upper valve body; secure with nineteen bolts.
- Tighten:
- A: 50 mm (1.97 inches) lower-to-upper valve body bolts to 6 Nm (53 ft. lbs.).
- B: 38 mm (1.50 inches) lower-to-upper valve body bolts to 6 Nm (53 ft. lbs.).
- C: 20 mm (0.78 inch) lower-to-upper valve body bolts to 10 Nm (89 ft. lbs.).





5. Pressure relief valve check ball, spring and retainer onto lower valve body; secure with one bolt.
- Tighten pressure relief valve retaining bolt to 6 Nm (53 ft. lbs.).
6. Two new O-rings onto shift solenoids No.1 and 2.





7. Shift solenoids No.1 and 2 into lower valve body; secure with one bolt.
- Tighten solenoid retaining bolt to 6 Nm (53 ft. lbs.).
8. One new O-ring onto TCC solenoid.
9. TCC solenoid into lower valve body; secure with one bolt.
- Tighten solenoid retaining bolt to 6 Nm (53 ft. lbs.).
10. One bolt, throttle valve cam sleeve, return spring and throttle valve cam onto upper valve body; secure with one bolt.
- Tighten throttle valve cam bolt to 10 Nm (89 ft. lbs.).