| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Note |
| With AC, Add | 0.4 | 0.2 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Crankshaft, Renew | 3.3 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Oil Pump, Renew | 1.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Belt, Renew | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Tune-Up | 0.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Main Bearings. Renew | 1.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Valves, Grind |
| See Valves Grind Head Removed And Combinations. |
| One CYL | 5.5 | 3.9 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| All Cyls | 7.3 | 5.2 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Each Additional | 1.0 | 0.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |