Component Tests and General Diagnostics
ROOF OPENING PANEL CONTROL SWITCHPart 1:
Part 2:
1. Measure the resistance between the terminals.
2. Apply +12v battery positive to the roof opening panel control switch C9014 pin 1, component side and ground to the roof opening panel control switch C9014 pin 6, component side. The LED should illuminate.
3. If all measurements of the roof opening panel control switch are as noted, return to the Pinpoint Test. Otherwise, install a new roof opening panel control switch.