| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind |
| Both Banks | 13.7 | 9.8 | A | Includes: R&R Cylinder Heads & Make All Necessary Ajustments. After Engine Removed. |
| One Bank | 9.8 | 6.8 | A | Includes: R&R Cylinder Heads & Make All Necessary Ajustments. After Engine Removed. |
| NOTE |
| To Knurl Valve Guides, Add |
| One | 0.1 | 0.0 | A | |
| To Renew Valve Lifters, Add |
| One Bank | 2.0 | 0.0 | A | |
| Both Banks | 3.9 | 0.0 | A | |
| To Perform Tune-Up, Add | 0.9 | 0.0 | A | |
| To Renew Valve Guides, Add |
| One | 0.2 | 0.0 | A | |
| To Renew Rocker Arms, Add |
| One Bank | 0.3 | 0.0 | A | |
| Both Banks | 0.5 | 0.0 | A | |
| To Renew Camshaft, Add |
| Right Bank | 3.0 | 0.0 | A | |
| Left Bank | 3.1 | 0.0 | A | |
| Both Banks | 3.4 | 0.0 | A | |
| To Ream Guide, Add | 0.1 | 0.0 | A | |