System Specifications
General Specifications1 of 6
2 of 6
3 of 6
4 of 6
5 of 6
6 of 6
a Newly installed-refers to the condition of the "NEW" drive belt before the engine has made no more than one rotation and before the belt has had a chance to stretch or seat into the pulley grooves.
b Time necessary for plunger to leak down 1.6 mm of travel with 222 N force and leak down fluid in tappet.
c Distance front edge of bearing is installed below front face of cylinder block.
d 0.050 Undersize-add 0.025 to standard thickness.
e Pin bore and crank bearing bore must be parallel and in same vertical plane within the specified total difference when measured at the ends of a 203 mm bar, 101.5 mm on each side of rod centerline.
f Cylinder bore diameter measured at 31 mm (1.24 inch) from top of block.
Red-90.200-90.210
Blue-90.210-90.220
Yellow-90.220-90.230
g Measured at 31.5 mm from top of block. Measured at 43 mm from top of piston, at 90 degrees to the piston pin.
h If applicable, measured vertically, +0.030-0.050 mm (0.001-0.002 inch) measured horizontally (oval pin bore).
i Specification in 90.200 mm diameter gauge.
j With installation of a new filter.
Drive Belt Tension
Torque Specifications
1 of 5
2 of 5
3 of 5
4 of 5
5 of 5
a Refer to the procedure.