|  | Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | 
| Replace | 
| All Cylinders | 14.7 | 10.8 | A | Includes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. | 
| One Cylinder | 
| Right Bank | 8.8 | 6.2 | A | Includes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. | 
| Left Bank | 9.8 | 6.7 | A | Includes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. | 
| Both Banks | 11.8 | 8.4 | A | Includes: R&I Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. | 
| NOTE | 
| To R&R Connecting Rod Bearings, Add | 
| Each | 0.1 | 0.0 | A |  | 
| To R&R Piston, Pin or Connecting Rod, Add | 
| One | 0.2 | 0.0 | A |  | 
| Each Additional | 0.1 | 0.0 | A |  | 
| All | 0.7 | 0.0 | A |  | 
| To Grind Valves, Add | 
| All Cylinders | 4.4 | 0.0 | A |  | 
| To R&R Spark Plugs, Add | 0.3 | 0.0 | A |  |