Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One
Right Bank10.87.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank11.88.1AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
One, Each Bank14.710.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
All, Both Banks18.813.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew2.00.0A
Crankshaft, Renew
Manual Trans4.90.0A
Auto Trans4.70.0A
Oil Pump, Renew1.30.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain or Gears, Renew1.40.0A
Tune-Up0.70.0A