Cylinder Block Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Auto Trans | 17.2 | 12.3 | A | Includes: R&R Engine And Transaxle As An Assembly And Replacement Of All Necessary Components. |
| Manual Trans | 16.8 | 12.0 | A | Includes: R&R Engine And Transaxle As An Assembly And Replacement Of All Necessary Components. |
| Note | ||||
| To Grind Valves, Add | 2.7 | 1.9 | A | |
| With AC, Add | 1.1 | 0.8 | A | |
| With PS, Add | 0.7 | 0.2 | A | |
| To Replace Transaxle, Add | 0.8 | 0.5 | A |