Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
One Bank8.05.7AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks10.47.4AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
All Cylinders17.512.5AIncludes: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew
Manual Trans2.50.0A
Auto Trans2.20.0A
Crankshaft, Renew4.30.0A
Oil Pump, Renew
Manual Trans1.50.0A
Auto Trans1.30.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Seal, Renew
Manual Trans1.10.0A
Auto Trans1.70.0A
Camshaft, Renew3.00.0A
Timing Chain or Gears, Renew1.30.0A
Valve Lifters, Renew1.80.0A
Tune-Up0.70.0A