Disassembly and Assembly of Subassemblies
ASSEMBLE FORWARD GEAR TRAINExploded View Of Forward Gear Train Assembly:
1. Assemble forward clutch to reverse high clutch, positioning No. 5 thrust washer between them.
2. Assemble forward planet gear carrier to internal gear with needle bearing thrust washer No. 8 between them.
3. Position thrust washer No. 7 on internal gear and install snap ring on gear carrier.
4. Position thrust washer No. 6 into forward clutch and install front planet assembly into forward clutch.
5. Position needle bearing washer into forward planet gear carrier and install clutch hub and sun gear.