Shift Control Solenoid Valve B (SCSV-B)
Shift Control Solenoid Valve B Inspection:
1. Disconnect the Shift Control Solenoid Valve B connector.
2. Measure the resistance between the solenoid connector terminal 4 and ground.
RESISTANCE
Approx. 3 ohms at 68° F
3. If the measured resistance does not match the standard value, replace the solenoid valve assembly.