| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace | 17.2 | 0.0 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs. |
| Main Bearings, Renew | 1.4 | 0.0 | A | Add The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew | 3.0 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump, Renew | 1.0 | 0.0 | A | Does Not Include: R&R Engine. |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
| Rear Main Seal, Renew | 0.3 | 0.0 | A | After Engine Or Trans Are Removed. |
| Timing Belt, Renew | 0.8 | 0.0 | A | After Engine Or Trans Are Removed. |
| Valves, Grind |
| See Valves, Grind Head Removed And Combinations. |
| Tune-Up | 0.5 | 0.0 | A | See Valves, Grind Head Removed And Combinations. |