Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Pulsed Secondary Air Injection: Testing and Inspection


FUNCTIONAL CHECK
1. Connect hand operated vacuum pump to rubber hose of Pulse Air valve.
2. Apply 15 inches Hg or greater to valve. If vacuum drops in less than two seconds, replace valve.