Pressure Hose
INSTALL
1. Raise and support vehicle Maintenance
2. Install pressure hose in engine compartment from underneath.
NOTE: Always use a NEW O-ring on the end of the pressure hose.
3. Lubricate new O-ring on steering gear end of pressure hose with clean power steering fluid.
4. Install pressure hose (2) to steering gear (1). Do not tighten tube nut at this time.
5. Route pressure hose along right side of engine cradle. Position pressure hose (1) routing clamp over return hose (2) routing clamp, then install screw (4) securing hoses to right side of engine cradle (3).
6. Route pressure hose along front of engine cradle. Install screw (5) through routing clamp securing hose to front of engine cradle (3).
7. Tighten pressure hose tube nut at steering gear to 47 Nm (35 ft. lbs.).
8. Install belly pan Belly Pan - Installation.
9. Lower vehicle.
NOTE: Always use a NEW O-ring on the end of the pressure hose.
10. Lubricate new O-ring on power steering pump end of pressure hose with clean power steering fluid.
11. Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 Nm (35 ft. lbs.).
12. Install air cleaner housing and inlet tube. Air Cleaner Body - Installation
13. Connect negative battery cable (2) to battery post. It is important that this is performed properly.
14. Fill and bleed power steering system.
INSTALLATION
1. Install pressure hose in engine compartment from underneath.
NOTE: Always use a NEW O-ring on the end of the pressure hose.
2. Lubricate new O-ring on steering gear end of pressure hose with clean power steering fluid.
3. Install pressure hose (2) to steering gear (1). Do not tighten tube nut at this time.
4. Route pressure hose along right side of engine cradle. Position pressure hose (1) routing clamp over return hose (2) routing clamp, then install screw (4) securing hoses to right side of engine cradle (3).
5. Route pressure hose along front of engine cradle. Install screw (5) through routing clamp securing hose to front of engine cradle (3).
6. Tighten pressure hose tube nut at steering gear to 47 Nm (35 ft. lbs.).
7. Install belly pan Belly Pan - Installation.
8. Lower vehicle.
NOTE: Always use a NEW O-ring on the end of the pressure hose.
9. Lubricate new O-ring on power steering pump end of pressure hose with clean power steering fluid.
10. Install pressure hose (2) to pump (1). Tighten pressure hose tube nut to 47 Nm (35 ft. lbs.).
11. Install air cleaner housing and inlet tube. Air Cleaner Body - Installation
12. Connect negative battery cable (2) to battery post. It is important that this is performed properly. Battery Reconnection
13. Fill and bleed power steering system. Steering - Power Steering System Bleeding