P0038
P0038-O2 SENSOR 1/2 HEATER CIRCUIT HIGH
For a complete wiring diagram Consult Diagrams/Electrical.
- When Monitored:
Battery voltage above 10.6 volts, ASD is powered up, and O2 heater is off.
- Set Condition:
Desired state does not equal Actual state. One Trip Fault. Three good trips to turn off the MIL.
Always perform the Pre-Diagnostic Troubleshooting procedure before proceeding. Initial Inspection and Diagnostic Overview.
Diagnostic Test
1. ACTIVE DTC
Ignition on, engine not running.
With a scan tool, select View DTCs.
Is the DTC Active at this time?
Yes
- Go To 3
No
- Refer to the INTERMITTENT CONDITION Diagnostic Procedure. Checking for an Intermittent DTC.
2. (K299) O2 1/2 HEATER CONTROL CIRCUIT
Ignition on, engine not running.
NOTE: The DTC needs to be cleared before actuating the Heater Test, if the DTC is not cleared, the Heater Test may not be allowed to actuate.
With a scan tool, actuate the O2 1/2 Heater Test with the O2 Sensor harness connector still disconnected.
Using a 12-volt test light connected to 12-volts, probe the (K299) O2 1/2 Heater Control circuit in the O2 Sensor harness connector.
Does the test light illuminate brightly and flash on and off during the actuation?
Yes
- Go To 3
No
- Go To 4
3. O2 HEATER ELEMENT
Turn the ignition off.
NOTE: Allow the O2 Sensor to cool down to room temperature.
Disconnect the 1/2 O2 Sensor harness connector.
Measure the resistance across the O2 Sensor Heater element, between the Heater Control terminal and the Heater ground terminal at the component.
NOTE: O2 Heater Element resistance values should be measured at 21.1° C (70° F). The resistance value will vary with different temperature values.
Is the O2 Sensor Heater Element resistance between 2.0 and 30.0 ohms?
Yes
- Refer to the INTERMITTENT CONDITION Diagnostic Procedure. Checking for an Intermittent DTC.
No
- Replace the O2 Sensor.
- Perform the PCM Verification Test.PCM Verification Test
4. (K299) O2 1/2 HEATER CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE
Turn the ignition off.
Disconnect the C1 PCM harness connector.
Ignition on, engine not running.
Using a 12-volt test light connect to ground, probe the (K299) O2 1/2 Heater Control circuit in the O2 Sensor harness connector.
Does the test light illuminate brightly?
Yes
- Repair the short to battery voltage in the (K299) O2 1/2 Heater Control circuit.
- Perform the PCM Verification Test.PCM Verification Test
No
- Go To 5
5. (K299) O2 1/2 HEATER CONTROL CIRCUIT OPEN
Turn the ignition off.
Measure the resistance of the (K299) O2 1/2 Heater Control circuit from the O2 Sensor harness connector to the C1 PCM harness connector.
Is the resistance below 5.0 ohms?
Yes
- Go To 6
No
- Repair the open in the (K299) O2 1/2 Heater Control circuit.
- Perform the PCM Verification Test.PCM Verification Test
6. PCM
NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.
Were there any problems found?
Yes
- Repair as necessary.
- Perform the PCM Verification Test.PCM Verification Test
No
- Replace and program the Powertrain Control Module.
- Perform the PCM Verification Test.PCM Verification Test