Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Installation






2.7L





1. Install generator.





2. Install upper bolt mounting bolt.





3. Install 2 lower mounting bolts.

4. Tighten bolts to 65 Nm (48 ft. lbs.).





5. Install B+ terminal nut and wire. Tighten nut to 13 Nm (115 in. lbs.).

6. Connect generator field circuit plug.

7. Install generator drive belt.

8. Connect negative battery cable.