Seat Belt Buckle Switch: Testing and Inspection
Chime Module Terminals:
Chime Module Wiring:
1. Using an ohmmeter, test terminal 5 of the chime module connector for ground with driver and passenger seat belt buckled.
2. If not grounded, test both seat belt buckle switches for a good ground.
3. If ground is OK, replace buckle switch. If not grounded, repair as necessary.