Rocker Arm Assembly: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| Both Banks | 8.1 | 5.6 | B | Includes: R&R Valve Cover. |
| Front Bank | 5.2 | 3.6 | B | Includes: R&R Valve Cover. |
| Note | ||||
| With Turbo, Add | 0.7 | 0.4 | B | |
| Rear Bank | 6.8 | 4.7 | B | Includes: R&R Valve Cover. |