Connecting Rod Bearing: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Replace | ||||
| One | 3.6 | 2.0 | A | Includes: R&R Oil Pan & Plastigage Bearings. |
| Each Additional | 0.4 | 0.2 | A | Includes: R&R Oil Pan & Plastigage Bearings. |
| Note | ||||
| To Replace Oil Pump, Add | 0.4 | 0.2 | A | |
| Main & Rod Bearings | 10.8 | 8.0 | B | Includes: R&R Oil Pan & Plastigage Bearings. |
| Note | ||||
| With AC, Add | ||||
| No 1 | 0.4 | 0.2 | B | |
| With PS, Add | ||||
| No 1 | 0.4 | 0.2 | B | |
| With A520, 555 Trans, Add | ||||
| No 5 | 0.5 | 0.3 | B | |
| To Replace Oil Pump, Add | 0.4 | 0.2 | B |