Operation CHARM: Car repair manuals for everyone.
Hosted by mcallihan.com

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank10.87.8AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Rear Bank11.88.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks14.710.5AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Oil Pump, Renew2.20.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Transaxle1.40.0A
Auto Transaxle1.80.0A
Timing Belt, Renew1.30.0A
Tune-Up0.50.0A
Note
With AC, Add0.40.2A
To Grind Valves, Add5.03.6A
To Replace Cylinder Heads, Add
One Bank2.71.9A
Both Banks5.33.8A