| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One CYL |
| Front Bank | 10.8 | 7.8 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Rear Bank | 11.8 | 8.4 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Both Banks | 14.7 | 10.5 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Each Additional | 1.0 | 0.7 | A | Includes: R&R Cylinder Head, Oil Pan & Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.0 | 0.0 | A | |
| Oil Pump, Renew | 2.2 | 0.0 | A | |
| Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
| Rear Main Oil Seal, Renew |
| Manual Transaxle | 1.4 | 0.0 | A | |
| Auto Transaxle | 1.8 | 0.0 | A | |
| Timing Belt, Renew | 1.3 | 0.0 | A | |
| Tune-Up | 0.5 | 0.0 | A | |
| Note |
| With AC, Add | 0.4 | 0.2 | A | |
| To Grind Valves, Add | 5.0 | 3.6 | A | |
| To Replace Cylinder Heads, Add |
| One Bank | 2.7 | 1.9 | A | |
| Both Banks | 5.3 | 3.8 | A | |