| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Resurface/Grind | 7.5 | 5.0 | A | Includes: R&R Cylinder Head And Make All Necessary Adjustments. |
| Add the Following Operations If Performed With Valves, Grind |
| Valve Guide, Knurl |
| Each | 0.1 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Valve Guides, Renew |
| Each | 0.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Note |
| To Ream Guide, Add | 0.1 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Rocker Arm Shaft, Overhaul |
| Each Shaft | 0.7 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Timing Belt, Renew | 0.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Valves, Grind. |
| Head Removed | 1.8 | 1.2 | A | |