Valve: Labor Times
| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
| Resurface/Grind | ||||
| All Cyls | ||||
| Right Bank | 10.6 | 6.7 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| Left Bank | 11.0 | 7.2 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| Both Banks | 15.6 | 11.5 | A | Includes: R&I Cylinder Heads And Make All Necessary Adjustments. |
| NOTE | ||||
| To Knurl Valve Guides, Add | ||||
| One | 0.1 | 0.0 | A | |
| To Ream Guide, Add | 0.1 | 0.0 | A | |
| To R&R Lifters, Add | ||||
| Each | 0.3 | 0.0 | A | |
| To R&R Valve Guides, Add | ||||
| One | 0.2 | 0.0 | A |