Intake Manifold Replacement - Left Side (LBZ, LLY)
Intake Manifold Replacement - Left Side (LBZ, LLY)
Removal Procedure
1. Remove the center intake manifold.
2. Remove the left fuel rail.
3. Remove the intake manifold bolts/nuts.
4. Important: The intake manifold uses sealer. Pry at the area by the fuel rail bolt holes in order to avoid damage to the sealing surface.
Remove the intake manifold.
5. To prevent entry of debris into the cylinder head, tape the openings.
6. If required, clean and inspect the intake manifold. Refer to Intake Manifold Cleaning and Inspection.
Installation Procedure
1. Apply a 2 - 3 mm (1/8 inch) wide, by 0.5 - 1.5 mm (1/16 inch) high bead of sealant to the intake manifold. Refer to Sealers, Adhesives, and Lubricants for the correct part number.
2. Install the intake manifold.
3. Install the intake manifold bolts/nuts.
Left Side:
4. Notice: Refer to Fastener Notice in Service Precautions.
Tighten the intake manifold bolts/nuts in the sequence shown.
Tighten the bolts/nuts to 21 Nm (15 ft. lbs.).
5. Install the left fuel rail.
6. Install the center intake manifold.